NEW QUESTION 23
Which of the following combinations must you use to create a single-cycle maintenance plan for an external service?
Please choose the correct answer.
Response:

  • A. A maintenance order for settlement and an outline agreement
  • B. A framework order and a maintenance order for settlement
  • C. A subcontract purchase order and an outline agreement
  • D. A framework order and a subcontract purchase order

Answer: B

 

NEW QUESTION 24
A user has planned an operation with labor costs and material costs; however, the material cost element is not assigned to a value category.
Where do the material costs appear in the value categories for the order?

  • A. In the internal activity value category
  • B. In the overhead value category
  • C. In a new, automatically created value category
  • D. In the unassigned value category

Answer: D

 

NEW QUESTION 25
Name the data which is created during the monitoring, controlling, regulation and optimization of a technical process.
Please choose the correct answer.
Response:

  • A. Process control system
  • B. WAMP
  • C. Document entry
  • D. Measurement system

Answer: A

 

NEW QUESTION 26
You are using a maintenance plan for test equipment calibrations. When is an inspection lot created?
Please choose the correct answer.
Response:

  • A. When a follow-up action is triggered from a malfunction report
  • B. When the calibration order is created
  • C. Before the calibration order is created
  • D. After entering measuring point data that is out of tolerance

Answer: B

 

NEW QUESTION 27
Your customer executes deadline monitoring (transaction IP30).
What happens after you insert additional call dates using the manual call function?
Please choose the correct answer.
Response:

  • A. The system restarts the maintenance plan.
  • B. The system retains the normal scheduled call dates.
  • C. The system reschedules all previous scheduled call dates.
  • D. The system fixes the next scheduled call date.

Answer: B

 

NEW QUESTION 28
An administrator wants to configure an SC Series array to use Virtual Port Mode. What is a requirement to accomplish this task?

  • A. NPIV must be disabled on Fibre Channel switches
  • B. I/O Controller cards must use a single-ID firmware version
  • C. Activation license must be installed
  • D. Fibre Channel switches must use an arbitrated loop topology

Answer: D

Explanation:
Explanation/Reference:
Reference https://www.dell.com/support/manuals/lt/en/ltbsdt1/dell-compellent-sc4020/sc4020om-v8/ requirements-for-virtual-port-mode?guid=guid-90fdb7bf-141b-4218-b3e5-2acb34acf90d&lang=en-us

 

NEW QUESTION 29
Your customer wants the system to generate a serial number and an equipment master upon goods receipt of a material.
Which Customizing steps are required?

  • A. Create a serial number profile and assign it to an equipment master.
  • B. Create a serial number profile and assign it to a view profile for technical objects.
  • C. Create a serial number profile and assign it to a serializing procedure.
  • D. Create a serializing procedure and assign it to an equipment master.

Answer: C

 

NEW QUESTION 30
What options are available in the maintenance order when you analyze costs using value categories? (Choose two)

  • A. Display of values in an alternate currency
  • B. Summary of actual costs across multiple cost elements
  • C. Display of costs by responsible work center
  • D. Display of costs by individual operations

Answer: B,D

 

NEW QUESTION 31
Under which conditions you can change stock information in the serial number manually.
There are 2 correct answers to this question.
Response:

  • A. No stock check is active
  • B. BOM active
  • C. Sterilization operation
  • D. All active
  • E. No plant has been entered

Answer: A,E

 

NEW QUESTION 32
What is the purpose of the usage list for equipment history?
There are 2 correct answers to this question.
Response:

  • A. To display changes to history-related fields in an equipment master record
  • B. To track where the equipment was installed
  • C. To display the list of previous equipment operators
  • D. To document the number of breakdowns for an object

Answer: A,B

 

NEW QUESTION 33
You are installing a new SC9000. Which procedure should be used to install and configure the system?

  • A. Connect through a null modem cable to the serial port
  • B. Connect through the Dell Storage Manager Client
  • C. Connect through the supplied proprietary serial cable to the serial port
  • D. Connect through the iDRAC port

Answer: C

 

NEW QUESTION 34
What are the prerequisites for installing equipment at a functional location?
There are 2 correct answers to this question.
Response:

  • A. A cost center is assigned to the equipment.
  • B. The functional location master record allows the installation.
  • C. The equipment category of the equipment allows the installation.
  • D. A fixed asset is assigned to the equipment.

Answer: B,C

 

NEW QUESTION 35
A maintenance technician replaces a defective counter with a new counter.
Before the users can create a standard measuring document for the new counter, what step(s) must they perform?

  • A. Create a new technical object to represent the new measuring point.
  • B. Dismantle the old measuring point and create a new measuring point.
  • C. Create a special measuring document and set the Counter Replacement indicator.
  • D. Create a new measuring point and change the measuring point from which the measurement reading was transferred.

Answer: C

 

NEW QUESTION 36
What does the scheduling period determine in the maintenance plan scheduling parameters?
Please choose the correct answer.
Response:

  • A. The duration for which the system generates maintenance orders immediately
  • B. The duration for which the system generates planned or call dates during scheduling
  • C. The validity period of the maintenance plan
  • D. The duration for which the system generates maintenance notifications immediately

Answer: B

 

NEW QUESTION 37
How much memory is required if a customer plans to use the Dell Storage Replication Adapter for VMware with their Dell EMC Data Collector?

  • A. 12 GB
  • B. 10 GB
  • C. 4 GB
  • D. 8 GB

Answer: C

 

NEW QUESTION 38
For which purpose do you use the sequence number in a cycle set?
Please choose the correct answer.
Response:

  • A. To sequence the operations in the task list assigned to a maintenance item
  • B. To assign a cycle set to the task list of a maintenance item
  • C. To assign the cycle set to a maintenance item
  • D. To determine which strategy applies to each cycle

Answer: C

 

NEW QUESTION 39
What all are the steps take part in external work center.
There are 2 correct answers to this question.
Response:

  • A. Technical completion
  • B. Order
  • C. Notify
  • D. Structure
  • E. Process

Answer: A,B

 

NEW QUESTION 40
A company is using an SC7020 array and the storage administrator wants to expand the available capacity by adding 48, 3.5" disk drives. Which expansion enclosures can be used to meet the demand?

  • A. 4x SC200 drive bays
  • B. 2x SC420 drive bays
  • C. 4x SC400 drive bays
  • D. 2x SC220 drive bays

Answer: D

 

NEW QUESTION 41
How the settlement rule for suborder is to be determine in the Customizing setting for order type .
Please choose the correct answer.
Response:

  • A. Copy the main order as the settlement receiver
  • B. Do not copy order
  • C. None of the above
  • D. Apply CATS

Answer: A

 

NEW QUESTION 42
When a user creates a notification or an order and enters a functional location as the reference object, you want the system to suggest the subordinate equipment automatically.
In addition to setting the reference object view in the order or the notification, what other settings must you make? (Choose two)

  • A. Set the Equipment-Installation Allowed indicator in the Functional Location master data record.
  • B. Set View Profiles for Technical Objects in Customizing.
  • C. Set the Single Installation indicator in the equipment master data record.
  • D. Set the Single Installation indicator in the Functional Location master data record.

Answer: A,D

 

NEW QUESTION 43
What all are the steps sequenced for structuring of technical process?
There are 2 correct answers to this question.
Response:

  • A. Identify
  • B. Structure
  • C. Define
  • D. Execute
  • E. Assign

Answer: A,B

 

NEW QUESTION 44
Your customer wants to utilize estimated costs in Plant Maintenance orders.
Which condition does the customer need to be aware of?

  • A. Planned costs must not exceed the estimated costs.
  • B. Planned costs overwrite estimated costs after release of the order.
  • C. A specific order type in which cost estimates are activated must be used.
  • D. Upon release of the order, estimated costs cannot be revised.

Answer: D

 

NEW QUESTION 45
Your customer has several plants.
How do you set up the maintenance organizational structure to implement centralized maintenance planning?

  • A. Define a plant and assign it to a company code.
  • B. Assign all your work centers to one of your central planning plants.
  • C. Define a planning plant and assign the maintenance plants to this planning plant in Customizing.
  • D. Assign all your work centers to one of your maintenance plants.

Answer: C

Explanation:
Explanation/Reference:

 

NEW QUESTION 46
In order costing, what is the allocation structure used for?
Please choose the correct answer.
Response:

  • A. To determine the cost element for debit to the order and credit from the order
  • B. To provide a hierarchy structure for posting costs to the general ledger
  • C. To provide a structure to summarize postings across cost elements
  • D. To determine the overhead costs that need to be applied to each cost element

Answer: A

 

NEW QUESTION 47
......